Sweetwater, TX Q3 2024
Vestas "Blue Creek" Campaign
112 Turbines • 448 Superloads • 6 Months
18.4M
Total Lbs Moved
Execution of a 250MW wind energy expansion. Required the coordination of 32 simultaneous 13-axle configurations and specialized blade trailers maneuvering through complex West Texas terrain. Zero incidents recorded.
Constraint Engineering
Route required reinforcement of 3 county bridges and temporary bypass construction.
Compliance Mastery
Coordinated 400+ distinct permits across 4 state jurisdictions.
