Project Archive

The Heavy
Portfolio

Sweetwater, TX Q3 2024

Vestas "Blue Creek" Campaign

112 Turbines • 448 Superloads • 6 Months

18.4M

Total Lbs Moved

Execution of a 250MW wind energy expansion. Required the coordination of 32 simultaneous 13-axle configurations and specialized blade trailers maneuvering through complex West Texas terrain. Zero incidents recorded.

Constraint Engineering

Route required reinforcement of 3 county bridges and temporary bypass construction.

Compliance Mastery

Coordinated 400+ distinct permits across 4 state jurisdictions.

Request Case Study PDF
Baton Rouge, LA Q1 2024

Crack Tower Relocation

195' Length • 380,000 lbs • Dual Lane

26

Line Axles Deployed

Turnkey transport of a petrochemical fractional distillation column. Utilized our Dual Lane perimeter deck to navigate low-clearance constraints in the Gulf Corridor.

Laser Scan Verification

3D route simulation confirmed < 2" overhead clearance at 3 key structures.

Request Schematic